Product Name : Patching Material
Product Introduction

Used Method:

1.       Clean and moisturize the construction area with water or clay water, then compact materials by hands before smooth the area by trowel.

2.       After construction is done, air dry for 1-3 hours before drying by heat. Then it can be used.

proimages/patching_-E1.jpg

Top